
Maha Metro Issues Bids for DDC Services for Pune Metro Line 5
The Maharashtra Metro Rail Corporation Limited (Maha Metro) has recently invited bids for the Detailed Design Consultancy (DDC) services for 14 elevated stations on Pune Metro Phase 2- Line 5. This significant development is a major step forward in the construction of the Pune Metro, which is expected to revolutionize the city’s public transportation system.
Pune Metro Phase 2- Line 5 is a 25.518 km long corridor that will connect Khadakwasla, Swargate, Hadapsar, and Kharadi, with a total of 22 stations along the route. The elevated stations, for which the bids have been invited, will be a crucial component of this corridor, providing a safe and efficient mode of transportation for commuters.
The Detailed Design Consultancy (DDC) service is an essential part of the construction process, involving the preparation of detailed designs for the stations, including architectural, structural, electrical, and mechanical designs. The consultant will be responsible for ensuring that the designs meet the required standards, are environmentally friendly, and are compatible with the overall Pune Metro system.
The Earnest Money Deposit (EMD) for this contract has been set at ₹1,85,500, which is a significant amount that reflects the importance of this project. The bid submission deadline is yet to be announced, and interested firms have until then to submit their bids.
The Pune Metro project is a major infrastructure development initiative that aims to provide a modern and efficient public transportation system to the city. The metro will reduce congestion on the roads, decrease travel time, and provide a cleaner and more environmentally friendly mode of transportation.
The Line 5 corridor, for which the bids have been invited, will be a significant addition to the Pune Metro network, providing connectivity to various parts of the city. The corridor will also have a significant impact on the local economy, providing job opportunities and stimulating growth and development in the area.
The Maharashtra Metro Rail Corporation Limited (Maha Metro) is responsible for the planning, design, construction, and operation of the Pune Metro. The corporation was established in 2009 and has been responsible for the development of the Pune Metro ever since.
The Pune Metro project has been divided into several phases, with Phase 1 already complete and operational. Phase 2, which includes the Line 5 corridor, is currently under construction and is expected to be completed in the near future.
The construction of the Pune Metro is a significant undertaking that requires careful planning and execution. The Detailed Design Consultancy (DDC) services are an essential part of this process, and the bids invited by Maha Metro are a major step forward in the construction process.
In conclusion, the invitation of bids for DDC services for 14 elevated stations on Pune Metro Phase 2- Line 5 is a significant development in the construction of the Pune Metro. The project is a major infrastructure development initiative that aims to provide a modern and efficient public transportation system to the city. The corridor will provide connectivity to various parts of the city, reduce congestion on the roads, and provide a cleaner and more environmentally friendly mode of transportation.
Source:
https://metrorailnews.in/bid-invited-for-ddc-service-for-pune-metro-line-5/